An in-depth case study on a 5,000 unit multi-tower residential community constructed record-breaking fast using Lida Group’s vertically integrated prefab techniques.
2023-Sep-15 16:03:24
By Admin

 

As urbanization intensifies worldwide, innovative builders accelerate housing supply through industrialized construction perfected by pioneers like Lida Group. A landmark apartment community in Shenzhen exemplifies such approaches slashing schedules for socioeconomic benefit.

Master planned as 15 mid-rise towers flanking retail-lined boulevards, modular coordination partitioned repeating floor typologies across standardized module sizes. Precast foundations incorporated plumbing risers discretely for rapid lift-and-shift erection.

Off-site, Lida engineered structural insulated composite wall and floor panels optimized for transport. Interior wet cores precisely compartmentalized building systems. BIM coordination validated interfaces minimizing joints 60% from conventional construction.

 

 

Modular assembly proceeded under strict process control within temperature-controlled factories. CNC machines cut openings within tolerance as components marriage directly to erection sequence. Vacuum infusion densified insulation without volatile emissions.

Sited logistics coordinated just-in-time panel deliveries atop 53’ trailers sequenced by tower/floor/unit. Cantilevered crane access precluded tower crane erection, exploiting truck-mounted auxiliary cranes ergonomically. Foundations simultaneously accepted six floors per day.

Facilitating fastest safe installation, modules lifted directly onto coupling hardware affixing in minutes. Internal trades concurrently installed within dropped ceilings as facade enclosed towers weekly. Only 10% workers traditionally required on-site maximized productivity remotely.

Completed towers required solely cosmetic upgrades under rapid six-month schedule rather than conventional 36 months – slashing interest and enabling early occupation. Lower costs sustained 30% below-market pricing expanding housing accessibility.

 

folding container house

folding container house

 

Post-occupancy evaluates energy savings 50% beyond code through airtight envelopes now weathering seasons without defect while structural monitoring confirms wind/seismic performance exceeding benchmarks. Residents enjoy significantly reduced living expenses liberating greater disposable incomes into the local economy.

This pioneering project establishes new global paradigms sustainably housing communities through partnership between design, engineering and fabrication integration. Lida Group’s visionaries lead building toward industry efficiencies catalyzing social progress worldwide through large-scale deployment.

 

 