As modular construction gains prominence enabling sustainable mass-production, exemplar projects emerge showcasing optimized efficiency potentials. For one pioneering prefabricator, an iconic new facility now exhibits revolutionary modular techniques minimizing waste through seamlessly integrated componentized assemblies.
Announced today, Lida Group unveiled plans for a prototype mega-factory designed through collaboration between renowned architects and engineering consultants. Constructed entirely off-site then rapidly erected on-site, the 300,000 sqft light industrial facility comprises standardized modular building units seamlessly connected like “giant interlocking building blocks”.
Each module integrates structural insulated wall and roof panels made from lightweight sandwich composites utilizing Lida’s automated wet layup technique. Applied to precise openings, integrated curtain wall panels enable column-free floorplates maximizing flexibility amidst unparalleled airtightness and thermal performance.
Foundations install in tandem with carefully choreographed just-in-time module placements supervised by AI via BIM integration. Erection proceeds at a rate of one floor per week minimizing on-site work and disrupting nearby developments 50% less than a traditionally-built facility.
Finishes proceed internally as exterior sealing nears completion within 16 weeks – a schedule typically requiring double the duration. Standard yet reconfigurable assemblies now provide formula for replicable mass-production globally.
Upon anticipated completion, the prototype exemplifies a new sustainable paradigm – exhibiting optimized modular construction potentials through minimized material usage and waste while cultivating streamlined prefabricated construction processes industrially applied worldwide.
In summary, through collaborative design optimizing interlocking modular assemblies, this showcase facility now establishes benchmarks promoting prefabricated potentials sustainably via seamlessly integrated prefabricated building envelopes configured at unprecedented construction speeds worldwide.
Related news
-
Venture capital firms invest in Lida Group’s expansion plans to mass produce accessible prefab homes and commercial buildings assembled across China using standardized steel frame and foam insulated structural panels
2023-11-03 15:00:11
-
Consultants praise Lida Group’s effective off-site manufacturing techniques to minimize construction waste from prefab modular buildings constructed with composite insulated wall panels
2023-11-03 14:26:04
-
Architects unveiling ambitious master plan to transform sprawling former steel works into world's largest urban making district centered around expanded network of refurbished connective steel structure workshop halls and supplied via elevated goods rail link from centralized new warehouse terminal.
2023-11-02 16:46:29
contact us
- Tel: +86-532-88966982
- Whatsapp: +86-13793209022
- E-mail: sales@lidajituan.com