Effective coordination between offsite fabricators and onsite erection crews is critical for structural steel projects to progress seamlessly. Careful planning, communication and documentation facilitates productivity.
Detailed contract documents clearly define division of scope, responsibilities, timelines and expectations. Fabrication drawings turned in phases match planned production capacity. Erection sequences govern needed submittals.
Fabricators convert design models to shop drawings verifying constructability, connection details, material availability and suitable tolerances for field assembly. Erectors provide feedback improving connections and handling.
Material deliveries schedule evenly times loads across project duration avoiding delays. “Just-in-time” windows coordinate yard preparation and crews standing by. Electronic tracking monitors shipments.
Pre-installation meetings coordinate lifting procedures, special erection components, field repairs authorization levels. Toolbox talks clarify field-revision protocols delineating approved change orders from requests suggestively addressed later.
Field verification reports document measurements taken and issues affecting fabrication or installation. Timely submittals enable pre-planning solutions versus delays addressing problems already erected.
Digital file exchanges follow standardized conventions. Fabrication models supplement drawings enabling virtual construction reviews detecting interferences in ample time to avoid rework.
Pre-assembly trials validate shop drawings. Field representatives witness TEST fits for non-standard connections facilitating approvals. First-article assemblies prove quality.
Upon arrival, components undergo inspection possibly involving NDT. Nonconforming items return to fabricators expeditiously for re-work to avoid erection delays or redesigns.
Progress meetings track RFI resolution and submittal statuses. Early warnings alert upcoming fabrication complete milestones or erection hitches enabling proactive problem-solving.
Through diligent coordination, steel erection proceeds rapidly atop carefully pre-engineered foundations without construction clashes or rework due to late design clarifications or field measurement variances optimized at the shop drawing stage.
Related news
-
Inspection and Testing of Steel Components Prior to Installation
2023-09-08 14:00:48
-
Setting Up Material Yards and Delivery Logistics for Steel Projects
2023-09-08 14:38:29
-
Reducing Construction Waste Through Prefabricated Steel Components
2023-09-07 14:57:39
contact us
- Tel: +86-532-88966982
- Whatsapp: +86-13793209022
- E-mail: sales@lidajituan.com