pro-banner
Factory Expands Capacity to Keep Pace with Rising Demand for Lida Group’s Structural Steel Systems Bringing High Quality Options to Developing Markets
2023-Dec-21 17:44:16
By Admin

 

Amid surging international interest in optimized structural steel building systems, Shandong-based modular construction leader Lida Group has announced a major $100 million factory expansion increasing annual production capacities by 50%. Strategically investing in advanced equipment upgrades boosts mass-customizable prefabricated components keeping pace supplying replicable standardized projects worldwide – particularly serving affordable housing demands within developing regions currently constrained by high costs and skilled labor shortages.

Targeted equipment augmentations focussed on automated roll forming, press-braking, welding and surface treatment processes will exponentially scale outputs through lean digitally-integrated continuous manufacturing. Mass roll forming of long-span structural beams, braces and stud framing will transform agricultural economies lacking wood resources through locally fabricated lightweight steel alternatives supplied near raw suppliers. Additional plasma profile cutting and CNC machining centers expediently process vast quantities plates into optimized member sizes according to 3D BIM models eliminating field modifications.

A centerpiece involves doubling integrated multi-axis robotic welding cells capable seam-fusing thousands feet preassembled steel daily unattended. Computer vision quality control scanning verifies integrity unmatched by arc-welders prone fatigue defects. Affiliating with specialized contractors extends capabilities galvanizing, powder-coating treatments preserving optimized steel minimizing maintenance over decades versus corrosion-prone alternatives unsuitable for many climate exposures. Strict LEAN protocols streamline just-in-time component sequencing avoiding bottlenecks across sequential state-of-the-art lines.

 

 

Beyond immediately supplying existing projects through higher production rates, expanded facilities position strategically partnering larger-scale affordable housing initiatives close material sources. Precut components and modular framing systems can be flat-packed compactly for over-land shipping or as break-bulk ocean freight. On-site assembly requires minimal skilled labor through simple mechanical connections verified quality welds between pre-assembled subcomponents. Standardizes enclosed buildings can be rapidly enclosing roofs withinweather exposed framing left for exterior finishes following.

Factory leaders project the expanded facilities doubling previous 100,000-ton annual capacities through a new generation of automated heavy gauge steel fabrication capabilities. Strict ISO quality systems and certifications uphold structural integrity across a range of developer, contractor or owner-supplied projects worldwide. Affordable construction innovations hold promise alleviating shortages sustainably where traditional methods struggle through optimized replicable efficiency. Continued R&D collaborations aim further lowering material and transportation costs maximizing housing volumes deliverable within budgetary constraints through process optimization.

 

 

In summary, major factory expansions undertaken by pioneering modular steel systems manufacturer Lida Group will exponentially increase production meeting urgent demands fueling the affordable housing revolution internationally. Advanced automated equipment upgrades strategically scale standardized component mass-production at a pivotal time construction alternatives are urgently demanded yet lacking within myriad developing regions. Investments reinforce global commitments optimizing steel construction standards through customized prefabricated solutions enabling sustainably scalable projects worldwide addressing shortfalls through continued innovation.

 

 

Contact us, please click here!