For distributors and manufacturers, every day a new facility sits incomplete delays revenue and opportunities. Recognizing this, Lida Group has perfected off-site prefabrication techniques dramatically compressing typical steel building schedules.
Concurrent Planning
Lida frontloads design with pre-approved component families streamlining approvals. Constructions managers coordinate trades from inception.
Batch Processing
Ramada modules, wall panels and other repetitive elements enter fabrication simultaneously for steady component flow to sites.
Logistics Optimization
Precise delivery sequences utilize multi-stop trucking routes minimizing transportation costs. Loading/unloading efficiencies shift full assemblies versus individual pieces.
Foundation Fast-Tracking
Shallower reinforced concrete foundations install rapidly versusdeep pilings. Soil preparation and underground utilities also begin immediately.
Panels Erected Like LegosTM
Interface details precisely locate panels to vertical and horizontal supports for plug-and-play assembly absent time-consuming field fitting or modifications.
Simultaneous Sub-Assemblies
At larger sites, multiple sub-contractor crews independently erect walls, install trusses and overlay roofing/siding concurrently versus phased hand-offs.
Crane Placement Expertise
Strategic placement of tower cranes or mobile lifts accelerates each process. Alternatives like self-erecting enclosures require no crane downtime.
Rapid Interior Fit-Out
Process utilities, conveyor systems and boarding integrate while exteriors near completion to transfer enclosures to clients within 3 months of groundbreaking.
Quality Assurance Embedded
Technicians conduct peer reviews and inspection checkpoints at each stage for immediate issue resolution versus postponed retrofitting.
This fully integrated approach replaces lagging responsibilities with advanced preparation. Where competitors require 12-18 months, Lida pioneers occupancy-ready solutions in a quarter of the time.
Related news
-
Optimizing Steel Warehouse Layouts and Logistics Flow for Manufacturing Operations with Customizable Solutions from Lida Group
2023-10-24 17:52:49
-
Sustainable and Durable Steel Structure Solutions for Commercial and Industrial Developments by Lida Group
2023-10-24 17:45:12
-
Reviewing case analysis validating transportation planning scenarios dependent on a critical mass of neighborhood electric shuttles functionally housed within a mixed-use cluster of compact Lida panel homes.
2023-10-20 17:37:19
contact us
- Tel: +86-532-88966982
- Whatsapp: +86-13793209022
- E-mail: sales@lidajituan.com