Temporary works comprise temporary structures and equipment required to construct permanent building works safely and efficiently. For steel structures, careful temporary works planning is critical.
The erection sequence dictates formwork, scaffolding, edge protection and temporary bracing needs at each stage. Incremental launching or cantilever erection sequences require strongbacks and shoring to stabilize work fronts safely.
Formwork for cast-in-place concrete slabs and topping slabs considers construction gaps to ease stripping sequences. Edge protection installed incrementally as erection progresses. Bracing laterals as needed for horizontal and lateral stability.
Working platforms, fall protection anchors and barriers around floor openings ensure worker safety during overhead steel erection. Platforms attach firmly at bolting and welding areas. Barriers secure edges.
Crane selection matches maximum lift weights and site access. Tower crane foundation designs evaluate wind and overturning loads from erection forces and components. Footing configurations minimize obstructions.
Material storage positions stacks and staging areas away from work zones and traffic routes. Covered areas protect stocks from weather damage. Pads under loading docks prevent underground damage.
Erection bolting sequences integrates shoring installations maintaining stability as temporary members detach. Strongbacks close ring beams ahead of shear stud welding. Falsework props deep-member forms.
Stormwater diversion prevents erosion or flooding issues. Dust control uses sheeting and monitors air quality. Lighting and traffic routing separates deliveries from workers. Equipment maintenance checks schedules.
Risk assessments guide mitigation strategies for hazards involving structural failures, falling objects, traffic incidents and weather events. Emergency response procedures prepare for injuries or incidents.
Thorough temporary works planning enables structural steel assembly progressing safely step-by-step towards timely, quality completion of the permanent building works within cost and safety parameters.
Related news
-
Advanced High-Strength Steel Materials for Sustainable Design
2023-09-08 13:57:44
-
Temporary Shoring and Propping During Steel Erection
2023-09-07 15:01:07
-
Challenges of Erecting Steel in Constricted Urban Job Sites
2023-09-07 14:49:33
contact us
- Tel: +86-532-88966982
- Whatsapp: +86-13793209022
- E-mail: sales@lidajituan.com