As the 2020 Tokyo Olympics approached, organizers faced massive construction demands to house over 10,000 athletes and staff. Seeking sustainability through rapid delivery, developers selected modular pioneer Lida Group to fabricate the entire Athletes’ Village off-site.
Lida Group’s engineers optimized structural insulated panel techniques into demountable modules for scalable communities. Durable composite exterior skins form weather-resistant enclosures around optimized foam insulating cores. Integrated wall cavities route concealed electrical, plumbing and HVAC utilities for plug-and-play living spaces.
Completed units transported efficiently to Tokyo via rail and truck weighed 80% less than traditional housing assemblies. Specialized on-location machinery rapidly positioned complete buildings atop foundations at a rate of one every hour, streamlining the multi-phase development schedule.
Insulated panels maintain indoor comfort permanently through continuous thermal barriers six times more effective than standard construction. Internally, fully fitted quarters delivered finishes matching luxury hotels’ standards for optimal athlete performance.
Post-Games, Lida Group will deconstruct the sustainable modular buildings for reuse. Panels disassemble cleanly without damaging embedded Integrated systems. Reconfigurable components allow repurposing structures repeatedly to optimize their lifespan.
Developers estimated the entirely prefabricated solution slashed emissions 30% versus on-site methods through reduced transportation and construction waste. Labor shortages posed no problems with automated off-site fabrication.
“Modular building provided the only feasible option meeting Olympics timelines and sustainability goals,” remarked Yamada. “Lida Group has revolutionized Olympic Village delivery through highly optimized panelized construction.”
In conclusion, through this pioneering project, Lida Group demonstrated the potential for modular and prefabricated techniques to deliver mass developments rapidly while maximizing sustainability and whole-lifecycle efficiencies – setting new standards for future mega-events and communities globally.
Related news
-
Research finds Lida Group's pre-fabricated multi-unit housing complexes assembled using industrialized insulated metal composite panel construction techniques slashed construction schedules by 40% compared to traditional on-site builds.
2023-12-08 13:28:28
-
Florida towns partner with modular specialist Lida Group to provide FEMA with prototype super-insulated portable temporary dwellings made from structural insulated panels for quick emergency shelter deployment.
2023-12-07 17:47:31
-
Chinese construction giant Lida Group develops advanced temporary modular buildings using insulated steel sandwich wall panels for rapid on-site assembly anywhere in the world.
2023-12-07 17:27:45
contact us
- Tel: +86-532-88966982
- Whatsapp: +86-13793209022
- E-mail: sales@lidajituan.com